Industrial Complex with Multi-Tenant Potential | Krosno Airport (EPKR), Poland
ENPLUADE
For Sale – Industrial Complex with Multi-Tenant Potential | Airport-Adjacent, Krosno, Poland

Industrial Complex
with Multi-Tenant Potential
Airport-Adjacent
Krosno, Poland

13,931 m² of usable floor area on approx. 2.99 ha, directly adjacent to Krosno Airport (EPKR). Existing tenant generating PLN 1.14 million of net rent per year. Price of the entire complex: PLN 9.9 million (≈ USD 2.55M).

Price from USD 2.55M (PLN 9.9M) – offers to be submitted via the court trustee
13,931
m² floor area
2.99
hectares of land
9
buildings
~711
PLN per m² of floor area
1 MW
grid connection
1.14M
PLN net rent revenue per year
13,931 m² floor area · 2.99 ha · 9 buildings
1 MW grid connection · own 20 kV station (15 kV connection)
Operating tenant in place – PLN 1.14M p.a. net (≈ USD 293k), 11.5% gross yield
Price from ≈ USD 2.55M (PLN 9.9M)
Directly adjacent to Krosno Airport (EPKR)
~PLN 711 / m² of floor area (≈ USD 183)
2023 appraisal: PLN 20.87M / price: PLN 9.9M
Gas infrastructure on site · own wells · 20 kV station (15 kV connection)
Environmental permits in place (air · water)
Krosno Airport – Runway Extension to 2 km Planned
“Droga G” – planned southern link (concept stage)
VAT-Free ZCP Transaction
Clean Title – No Encumbrances
Existing Lease – 2-Month Termination Notice

Investment Highlights

Seven reasons why this industrial complex acquisition stands apart from typical distressed industrial assets.

01

Airport Expansion Next Door – USD 11.6M+ Programme

Krosno Airport (EPKR), directly adjacent, is planned for a runway extension from 1.1 km to 2 km – opening the field to larger passenger, business, cargo and military transport aircraft. Funding: ~USD 5.9M from the city plus, according to press reports and the City Office, USD 5.6M+ (PLN 21.6M+) of EU co-funding being applied for. Environmental decision issued 1 Oct 2026 – no EIA required.

02

Independent Energy Infrastructure

The site has its own 20 kV transformer station and a 15 kV grid connection – a rare asset giving independent power supply for energy-intensive industrial, logistics or data uses. Lower operational risk and cost. It also has gas infrastructure on site and its own wells (S-1, S-2); the internal water network belongs to the owner of the plots, so the buyer chooses how to bring in town water: from a neighbouring property, or via its own metering point with a connection to the MPGK Krosno network across the road.

03

Title Free of Encumbrances

All mortgages and restrictions are legally removed at the moment of sale under Art. 313 of the Bankruptcy Law, including all encumbrances on the property entered in Division IV of the land and mortgage registers.

04

Gateway Location – EU & Ukraine

Krosno sits ~90 km from the Krościenko–Smolnica border crossing with Ukraine and 110 km from the Medyka crossing. Ideal for EU-based production serving Eastern European markets.

05

Lease Terminates upon Sale

The ZCP is let under a lease agreement (currently PLN 1.14M p.a. net (≈ USD 293k)) for a fixed term until December 2026, with the possibility of concluding a new agreement. The agreement terminates upon the sale, subject to a 2-month notice period. Interim revenue from day one or a short horizon for repositioning/re-letting.

06

VAT-Free – Significant Cash Saving

The transaction concerns an Organised Part of an Enterprise (ZCP), which under Polish law is exempt from VAT, meaning lower capital requirements (net-price transaction).

07

Built for Aviation-Linked Repositioning

Beside an airfield set to take larger aircraft, the halls can be adapted for aircraft MRO and services, air cargo, UAV assembly or precision manufacturing – the investment-zone model the city itself wants to promote. The multi-tenant model lets a new owner develop modules independently.

Airport Expansion – Next Door

Krosno Airport Expansion

The City of Krosno plans to lengthen the runway of the adjacent Krosno Airport (EPKR) from 1.1 km to 2 km (USD 11.6M+ programme, 2026–2028, EU co-funding sought) and to create an investment zone for aviation-related companies beside the airfield. The environmental decision was issued on 1 October 2026 – no environmental impact assessment is required.

1.1 → 2 km
runway length (planned)
USD 11.6M+
programme value, 2026–2028
20,000+
airfield operations expected in 2026
USD 5.6M+
EU co-funding sought
Runway Extension – Phased
Today
1,100 m
Planned
1,100 m
+600 m
+300 m
01,000 m2,000 m

The extension runs towards ul. Zręcińska: first +600 m, then a further +300 m.

Status & Important Caveats

These are plans of the City of Krosno – they are not part of this sale and are not guaranteed. A building permit and funding are still required, and the environmental decision may be appealed within 14 days of receipt. Buyers should independently verify the programme's status and any planning or airspace constraints affecting the site. The site adjoins the airfield, but a physical airside (taxiway or apron) connection is not part of this sale and would need to be agreed with the airport operator and the City; buyers should verify this independently. Sources: Nowiny24 · City of Krosno (BIP), official announcement.

2.99 Hectares of Industrial Land in Krosno

Direct road access, adjacent to Krosno Airport (runway extension to 2 km planned). On site: 20 kV station with a 15 kV connection, gas infrastructure, own wells, an internal water network and town-water supply options, and environmental permits for air emissions and wastewater discharge.

See What's Included →
Site & Infrastructure
Watch the video

The Site
from Above

Aerial drone footage of the 2.99-hectare industrial site showing the full production complex, warehousing, and surrounding industrial zone.

The two production halls total 9,118 m² of usable area, supported by its own 20 kV transformer station (15 kV connection) and gas infrastructure on site.

20 kV

Own Transformer Station

Independent power supply for the entire site – a key enabler for energy-intensive industrial, logistics or data uses. 20 kV station; the grid connection is 15 kV.

Gas

Gas Infrastructure on the Plant Premises

Gas infrastructure on site; technical parameters to be obtained from the trustee.

2 wells

Own Wells & Water Network

Wells S-1 and S-2 and an internal water network owned by the owner of the plots. Town water: from a neighbour or via a separate metering point on the MPGK Krosno network. The possibility and terms of town-water supply (including a tie-in to a neighbouring property's network or a new connection to the MPGK Krosno network) are not represented or warranted by the Trustee; costs and formalities are borne by the buyer. Wastewater and stormwater discharge – under water-law permits (see below).

13,931 m²

Usable Floor Area

Nine buildings: two production halls (9,118 m²), office block, raw-materials store, further warehouses, workshop, guardhouse and transformer station.

2.99 ha

Industrial Land

Industrial site of ~2.99 ha (of which ~2.34 ha built-up) in Krosno's industrial zone with road access.

76,532 m³

Building Volume

Substantial enclosed volume across the nine buildings – hall height up to 8 m (main hall), adaptable to assembly, logistics or storage uses.

Environmental permits

3 permits

The plant holds the following environmental permits:

  • Air emissions–Decision on introducing gases and dust into the air from the installations at ul. Lotników 4A, 38-400 Krosno – issued 2 Oct 2024, valid until 1 Oct 2034.
  • Industrial wastewater–Water-law permit for discharging industrial effluent containing substances particularly harmful to the aquatic environment from the glassworks into the sewer system of MPGK – Krośnieński Holding Komunalny Sp. z o.o. (ref. RZ.ZUZ.1.4210.155.2023.MK) – issued 6 Sep 2023, valid until 6 Sep 2027; issued by Wody Polskie, Catchment Board in Krosno.
  • Groundwater and stormwater–Water-law permit for abstracting groundwater from two wells (S-1 and S-2) and discharging treated rain and meltwater into the Marzec stream (ref. RZ.ZUZ.1.421.460.2018.JT, with amending decision of 12 Mar 2020) – valid until 8 Apr 2039; issued by Wody Polskie, Catchment Board in Krosno.
Location & Logistics

Krosno – Airport-Linked
Industrial Location

Krosno lies in the Subcarpathian Voivodeship, on the south-eastern edge of the EU. The city is investing in its airfield – with a runway extension to 2 km planned – and has an established industrial zone with a skilled workforce and specialist suppliers.

The site sits within Krosno's established industrial zone, with direct road access and directly adjoining Krosno Airport (EPKR). Rzeszów-Jasionka Airport (~60 km) offers the region's main commercial air connections. Per the appraisal, the site is about 5 km from Krosno city centre and ~2.5 km from national road DK28.

Critically, Krosno is approximately 90km from the Ukrainian border – making this one of the closest EU-standard manufacturing facilities to Ukraine.

Labour costs in Subcarpathia are significantly lower than Western Europe while the site enjoys full EU Single Market access and established export relationships.

ul. Lotników 4a, Krosno – Industrial Zone, Subcarpathian Voivodeship

Krosno, Subcarpathia, Poland EU Single Market ~90km to Ukraine Industrial Zone ~60km to Rzeszów-Jasionka Runway Extension Planned
01. Strategic Surroundings
Business surroundings of the site

The site lies in the industrial belt between Krosno and Szczepańcowa, beside Krosno Airport – surrounded by established industry and logistics, and by a road network the city is actively upgrading.

  • International business environment – neighbours include Eurocash's regional distribution centre in Szczepańcowa (18,000 m² on 5.5 ha, one of its 12 key warehouses in Poland). Krosno hosts 58 companies with foreign capital, among them Goodrich Aerospace (USA) and BeijingWest Industries / BWI (China).
  • Ul. Lotników upgraded – the city has completed the widening of the Lotników / Zręcińska junction with new turning lanes towards ul. Przemysłowa and Szczepańcowa (USD 223,000, contractor Strabag), serving companies in the expanding investment zone by the airport. A further ~20 ha is being prepared for that zone. krosno24.pl ↗
  • “Droga G” – planned southern link – the City of Krosno consulted a concept for a dual-carriageway road with a bridge over the Lubatówka, a fragment of the southern bypass running from the Lotników roundabout (ul. Witosa / ul. Lotników) towards ul. Bieszczadzka. Concept stage only; no timetable or funding announced. krosno.pl ↗
02. Plot Boundaries
Plot boundaries (geoportal extract)
Land and Mortgage Register Numbers (KW):
Location. ul. Lotników 4a, 38-400 Krosno. The site spans the Krosno industrial district (Przemysłowa precinct) and the adjoining village of Szczepańcowa (Chorkówka commune), where most of the buildings stand. Total land: ~2.99 ha (2.9865 ha).

I. Ownership (Szczepańcowa) – 2.5267 ha
KW KS1K/00017599/0: plots 318/30 (0.3996 ha) and 318/31 (1.5222 ha), divided from plot 318/12 (1.9218 ha) by decision of the Wójt of Chorkówka of 4 July 2022; plots 318/13 (0.0970 ha), 354/2 (0.0320 ha), 355/2 (0.0295 ha)
KW KS1K/00068007/6: plots 356/3, 356/4, 356/5, 356/6, 356/7, 356/8 (total 0.2144 ha)
KW KS1K/00070811/2: plot 334/4 (0.1100 ha)
KW KS1K/00069473/0: plot 334/5 (0.1220 ha)

II. Perpetual usufruct (Krosno) – 0.4598 ha
Land owned by the Municipality of Krosno; Milomax S.A. holds a 99-year perpetual usufruct (c. 73 years remaining as of 2023) and owns the structures as a separate property.
KW KS1K/00076204/6: plot 361/1 (0.0168 ha), plots 362/1, 362/2, 362/3, 362/5, 362/6 (total 0.4430 ha), Przemysłowa precinct.
03. Utilities Map
Utilities map – Krosno county e-map extractClick the map to enlarge

Site Utilities Map

Extract of the county's online map showing the utility networks on and around the plots – useful for checking connection points and network routes. In the portal, switch on the layer shown below.

Layer path (portal in Polish):
  1. Powiat Krosno
  2. Uzbrojenie terenu
Open the map ↗Larger map (JPG) ↗
03. What You Are Buying

Scope of Sale

The sale is structured as an Organised Part of an Enterprise (ZCP). Here is exactly what transfers to the buyer.

Included in the Sale

  • Real Property: 2.99 ha of land (2.34 ha built-up), 9 buildings, 13,931 m² usable area
  • Production Equipment: Installed industrial plant – melting furnaces, annealing lehrs, cutting, grinding and sandblasting machines, moulds
  • Energy Infrastructure: Own transformer station – independent power supply for the entire site
  • Existing Lease: Rent agreement in place (currently PLN 1.14M p.a. net (≈ USD 293k)) with a 2-month termination notice
  • Finished goods: Stock of finished products worth approx. USD 169,100 (PLN 657,434.46 – book and estimated value)
  • Warehouses #8 & #9: 3,276 m² of warehouse space on a separate cadastral plot – part of the package

Excluded from the Sale

Employees currently work for the lessee – not the bankrupt estate. A new owner negotiates directly with staff. No legacy liabilities are assumed by the buyer.

Transaction Structure

Sale typeTender for a ZCP (Organised Part of an Enterprise)
Conducted byBankruptcy Trustee (Syndyk), court-supervised
Pricefrom USD 2.55M (PLN 9.9M) – contact Trustee for current terms
VATOutside the scope of VAT – ZCP transfer is not subject to VAT
Liabilities assumedNone – this is an asset deal; the buyer does not assume the liabilities of the bankruptcy estate
TitleArt. 313 Bankruptcy Law: encumbrances in Division IV of the land and mortgage registers expire at the moment of sale and will be struck off
Existing leaseRent agreement in place – 2-month termination notice
Planning statusKrosno plots: local plan zone 12PU (production & services). Szczepańcowa plots: land-use study zone UC (development areas incl. existing industrial plants); no binding local plan currently in force

Aerial Site Plan with Building Numbering

Aerial site plan with building numbering
  1. 1Production Hall #15,102 m²
  2. 2Production Hall #24,016 m²
  3. 3Office Building690 m²
  4. 4Raw Materials Warehouse711 m²
  5. 5Guardhouse12 m²
  6. 6Transformer Station60 m²
  7. 7Mechanical Workshop64 m²
  8. 8Finished Goods Warehouse ★1,800 m²
  9. 9Additional Warehouse ★1,476 m²

Site development plan showing all nine buildings (numbering matches the technical table below), plot boundaries, road access and the relationship to Krosno Airport (EPKR).

Plant Data

# Building Footprint m² Usable Area m² Volume m³
1Production Hall #14,0265,10230,963
2Production Hall #23,2194,01623,620
3Office Building4006903,200
4Raw Materials Warehouse7117112,806
5Guardhouse251280
6Transformer Station6560–
7Mechanical Workshop7464360
8Finished Goods Warehouse ★1,8471,8008,230
9Additional Warehouse ★1,6211,4767,273
Total 11,98813,93176,532

★ Buildings #8 and #9 sit on separate cadastral plots. They are part of the sale package. Appraiser's technical data: built in stages 1993–2007 (steel-frame halls with insulated panels); technical wear 25–35% for the main buildings. The newest warehouse (#9) has no occupancy permit yet – completion works were estimated at USD 69,500 net (July 2022).

Note for Investors – Appraised Value: The independent real-property appraisal (25 Jan 2023) puts the market value of the land and buildings at USD 5.37M: USD 3.68M for the main production real estate (halls and buildings plus the perpetual usufruct), USD 1.65M for the warehouse plots (#8–#9, part of the package) and USD 39,000 for the remaining plots. Machinery is valued separately. The price of USD 2.55M (PLN 9.9M) is about 47% below the total appraised value of the land and buildings (about PLN 711 / USD 183 per m² of usable floor area) – and the buyer also gets ready energy infrastructure and existing lease revenue. Appraisal values exclude VAT.

05. Floor Plans
Ground-floor plan, production hall No. 1
Ground-floor plan – Production Hall No. 1 (rebuild and extension project), scale 1:100
Ground-floor plan, production hall and offices
Ground-floor plan – production hall, warehouses, offices and sample room (1997), scale 1:100

Original architectural ground-floor drawings of the main production hall complex, showing column grid, room layout and structural details. Click a plan to enlarge. Drawings are historical archive copies and carry hand annotations; they should be verified against the current as-built condition.

Electric power connection

From the electricity supply and distribution terms for the plant at ul. Lotników 4A (annex to the PGE agreement):

Connection power1,000 kW (connection group III)
Contracted power300 kW under the current contract – about 700 kW of connection capacity above it
Supply point15 kV connection to the site’s own 20 kV transformer station (“Huta Szkła DECO-GLASS”, fields 3–6); the station and equipment are operated by the customer
Voltage / fuses0.4 kV nominal; pre-meter fuses 500 A
TariffB23 (distribution and energy sale), monthly billing
ProviderPGE Obrót S.A.

Source: annex to the current electricity agreement (scan). Terms for a new owner must be agreed with the provider and the grid operator.

View the document (PDF) ↗

Industrial Infrastructure Transfers with the Sale

Installed plant and equipment, the 20 kV transformer station (15 kV connection), gas infrastructure and the buildings are included in the sale.

Development Scenarios

The primary scenario is a Modular Multi-Tenant Industrial Complex, with rental revenue already in place. Further repositioning scenarios build on the site's infrastructure and, above all, on the planned expansion of the adjacent airport.

01
Primary Scenario

Modular Multi-Tenant Industrial Complex

Divide the nine-building complex into independent production-warehouse modules for multiple lessees. An existing rent agreement (2-month termination notice) provides interim revenue while modules are prepared. Diversifying revenue across several tenants is the model banks readily finance as a stable commercial property portfolio – lower vacancy risk, higher net yield (NOI) – and adjacency to an expanding airfield makes the complex attractive to logistics- and aviation-linked tenants.

02

Aviation Services, MRO & Training

The city wants to attract aviation-industry and aircraft-service companies that today settle around airports able to take larger aircraft, and lists a training-and-research base for the aviation sector among the programme's goals. The halls beside the airfield could be adapted for maintenance, component workshops or training use.

03

Air Cargo & Last-Mile Logistics

With the runway planned at 2 km, the airfield is meant to handle freighter types such as the Boeing 737-SF and ATR-72 Cargo, and regular cargo is among the future possibilities the city names. Convert halls into a cargo terminal linking air and road transport, serving e-commerce and courier volumes in south-eastern Poland.

04

UAV / Drone Production & Service Hub

Proximity to Krosno Airport and large hall volumes suit the unmanned aerial vehicle sector: assembly lines, control rooms and test hangars beside the airfield. The airport programme is itself designed as dual-use (civil-military) infrastructure, and the UAV sector carries strong EU grant and defence co-financing potential.

05

High-Tech Power Hub – Data Centre / AI

In an era of grid connection deficits across Europe, this site is a ready-made skeleton for a data processing centre, AI rendering farm, or high-density compute facility. The own 20 kV transformer station (15 kV grid connection) provides a rare large-capacity connection. Gas infrastructure on site could enable CHP cogeneration for backup power and energy arbitrage (subject to confirmed gas parameters). Scale is set by the current 1 MW connection; larger loads would require a grid-capacity upgrade.

06

Strategic Energy Bank – PV + Grid Storage

14,000 m² of south-facing rooftop area combined with a high-capacity grid connection makes this a natural platform for a commercial energy storage system paired with large-scale photovoltaics. The strong grid tie-in enables energy arbitrage or local grid stabilisation – eligible for significant CEF and EU climate fund support. Scale depends on the current 1 MW connection; larger storage or PV export would require a grid-capacity upgrade.

Current Tenant & Lease

Revenue from Day One

USD 293k p.a.

Annual Rent

The current tenant has been in place for 9 years and pays PLN 95,000 per month plus VAT – PLN 1.14M (≈ USD 293,000) per annum net. A buyer steps into the landlord role with this cash flow from day one. The current annual rent corresponds to approx. 11.5% of the minimum price, before owner's costs and CAPEX.

#1–#7

Leased Area ~10,655 m²

The tenant leases buildings #1–#7. Warehouses #8 and #9 (~3,276 m²) are not let and are available for new tenants.

2 months

Lease Terminates upon Sale

The ZCP is let under a lease agreement (currently PLN 1.14M p.a. net (≈ USD 293k)) for a fixed term until December 2026, with the possibility of concluding a new agreement. The agreement terminates upon the sale, subject to a 2-month notice period. Interim revenue from day one or a short horizon for repositioning/re-letting. The tenant has no right of first refusal.

Lease Terms – Your Two Options

Terminate: the lease terminates 2 months after the sale of the ZCP. The buyer may reposition or re-let the buildings. Continue: alternatively, the buyer steps into the trustee's shoes as landlord and keeps the tenant and the rent. The full lease, rent roll and payment history are available after signing an NDA.

Ideal Buyer Profiles

Aviation & Aerospace Operator

An MRO, aircraft-services, UAV or aerospace-supplier business wanting space beside an airfield planned to take larger aircraft – with power and gas already on site.

Ukrainian / CEE Industrial Investor

An investor from Ukraine or CEE seeking EU-based manufacturing infrastructure, 90km from the Ukrainian border with EU market access.

Private Equity / Special Situations

A fund focused on distressed industrial assets – acquiring below appraised value, using the existing rent agreement for interim revenue, then repositioning around the airport expansion for a trade exit.

Industrial Real Estate Developer / REIT

A commercial property investor or REIT seeking a multi-tenant industrial complex with revenue in place, its own 20 kV transformer station (15 kV connection), airport adjacency and a title free of encumbrances (Art. 313) – a rare institutional-grade asset below appraised value.

Transaction Structure

How the Sale Works

Bankruptcy Process Timeline

1

Declaration of Bankruptcy

The court declares Milomax S.A. bankrupt

Completed
2

Trustee Appointed

The trustee takes over management of the bankruptcy estate

Completed
3

Valuations & Due Diligence

Appraisals, inventory, documentation

Completed
4

Sale – Active Stage

Date of the next offer round to be announced by the trustee – register your interest now

● Now
5

Offer Selection & Sale Agreement

Agreement in the form of a notarial deed; encumbrances expire (Art. 313)

Next stage
6

Transfer of Ownership & Register Entries

The new owner takes over the property; Division IV encumbrances struck off

Completion

A detailed timeline with dates and court documents is available in the trustee's due diligence pack.

Highest Level of Buyer Protection

Transaction Security – Sale by the Trustee

The organised part of the enterprise (ZCP) is offered by the trustee in bankruptcy proceedings conducted under the Bankruptcy Law, supervised by the supervisory judge and with the participation of creditors to the extent provided by law. The sale follows clearly defined legal rules, ensuring a high level of transparency and predictability.

When assets (including real estate) are sold, they are acquired, as a rule, free of encumbrances, which are transferred to the sale price in accordance with applicable law. Under Art. 313 of the Bankruptcy Law the sale has the effect of an enforcement sale: upon conclusion of the sale agreement, rights and personal claims disclosed in the land and mortgage register or reported to the trustee within the statutory deadline expire, and the entitled parties are satisfied from the sale price.

The transaction is an asset deal: the buyer does not assume the liabilities of the bankruptcy estate, and employees are employed by the lessee – no employment relationships pass to the buyer.

This transaction structure is widely used in professional dealings and is one of the most orderly and predictable forms of asset acquisition on the restructuring and insolvency market in Poland.

Key Transaction Features

  • Outside the scope of VAT–the transfer of a ZCP falls outside the scope of VAT; no VAT on the enterprise transfer
  • Encumbrances removed–encumbrances in Division IV of the land and mortgage registers expire at the moment of sale and will be struck off (Art. 313 Bankruptcy Law)
  • Effects of an enforcement sale–a sale in bankruptcy has the effects of an enforcement sale (Art. 313); sale agreement in the form of a notarial deed
  • Asset deal (ZCP)–the buyer does not assume the liabilities of the bankruptcy estate – no historic debts
  • Title Free of Encumbrances–ownership transferred by notarial deed, with register entries made once the encumbrances are struck off
  • Employees Excluded from the Sale–employees are employed by the lessee; the new owner negotiates directly
  • Full due diligence pack–valuation reports, inventory and opinions available immediately on request
  • Lease Termination Notice–existing rent agreement carries a 2-month termination notice

Download Official Documents

The documents come from the Trustee or were prepared on the basis of the Trustee’s materials. They allow you to assess the property before making an offer. The full list of documents (data room) is in the dropdown below.

Ready to Explore This Acquisition?

Register your interest with the Bankruptcy Trustee, download the information pack, and arrange a site visit.

Email the Trustee → Download Brochure
Contact & Next Steps

Get in Touch

Bankruptcy Trustee (Syndyk)

EntityMilomax S.A. w upadłości
Addressul. Lotników 4a, 38-400 Krosno, Poland
Phone(English / Polish)+48 697 400 500
Phone(Polish)+48 606 315 603
LanguagePolish primary; English documentation available

Due diligence materials are available immediately upon request.

Next Steps for Interested Buyers

  1. Download the Investment Brochure and the 2025 Tender Rules (links above)
  2. Review the valuation reports – real property appraisal, ZCP enterprise valuation, and inventory
  3. Submit an Expression of Interest (EOI) – or simply call – email [email protected] with your interest and profile, or call +48 697 400 500, to arrange a site visit of the plant
  4. Submit a binding offer per the trustee's sale procedure – deadline-driven process

The information presented on this page is for informational purposes only and does not constitute a commercial offer within the meaning of Art. 66 §1 of the Polish Civil Code, nor an investment recommendation. The Trustee and the authors of this page bear no responsibility for investment decisions made on the basis of materials contained herein. All investment decisions are made at the sole risk and discretion of the reader. Amounts originally stated in PLN are shown in US dollars for convenience, converted at the NBP average rate of 2 October 2026 (1 USD = 3.8881 PLN) and rounded; they are indicative only – the PLN amounts apply to the transaction.