13,931 m² of usable floor area on approx. 2.99 ha, directly adjacent to Krosno Airport (EPKR). Existing tenant generating PLN 1.14 million of net rent per year. Price of the entire complex: PLN 9.9 million (≈ USD 2.55M).
Seven reasons why this industrial complex acquisition stands apart from typical distressed industrial assets.
Krosno Airport (EPKR), directly adjacent, is planned for a runway extension from 1.1 km to 2 km – opening the field to larger passenger, business, cargo and military transport aircraft. Funding: ~USD 5.9M from the city plus, according to press reports and the City Office, USD 5.6M+ (PLN 21.6M+) of EU co-funding being applied for. Environmental decision issued 1 Oct 2026 – no EIA required.
The site has its own 20 kV transformer station and a 15 kV grid connection – a rare asset giving independent power supply for energy-intensive industrial, logistics or data uses. Lower operational risk and cost. It also has gas infrastructure on site and its own wells (S-1, S-2); the internal water network belongs to the owner of the plots, so the buyer chooses how to bring in town water: from a neighbouring property, or via its own metering point with a connection to the MPGK Krosno network across the road.
All mortgages and restrictions are legally removed at the moment of sale under Art. 313 of the Bankruptcy Law, including all encumbrances on the property entered in Division IV of the land and mortgage registers.
Krosno sits ~90 km from the Krościenko–Smolnica border crossing with Ukraine and 110 km from the Medyka crossing. Ideal for EU-based production serving Eastern European markets.
The ZCP is let under a lease agreement (currently PLN 1.14M p.a. net (≈ USD 293k)) for a fixed term until December 2026, with the possibility of concluding a new agreement. The agreement terminates upon the sale, subject to a 2-month notice period. Interim revenue from day one or a short horizon for repositioning/re-letting.
The transaction concerns an Organised Part of an Enterprise (ZCP), which under Polish law is exempt from VAT, meaning lower capital requirements (net-price transaction).
Beside an airfield set to take larger aircraft, the halls can be adapted for aircraft MRO and services, air cargo, UAV assembly or precision manufacturing – the investment-zone model the city itself wants to promote. The multi-tenant model lets a new owner develop modules independently.
The City of Krosno plans to lengthen the runway of the adjacent Krosno Airport (EPKR) from 1.1 km to 2 km (USD 11.6M+ programme, 2026–2028, EU co-funding sought) and to create an investment zone for aviation-related companies beside the airfield. The environmental decision was issued on 1 October 2026 – no environmental impact assessment is required.
The extension runs towards ul. Zręcińska: first +600 m, then a further +300 m.
On 1 October 2026 the President of Krosno issued the environmental decision for “Development of Krosno Airport infrastructure” – confirming that no environmental impact assessment is required and making the decision immediately enforceable, so the city can move straight to the building permit and EU funding.
This is an environmental decision only – a building permit and funding are still needed, and the parties may appeal within 14 days of receipt. It is the City's project, not part of this sale. Source: Nowiny24 · Official decision – BIP Krosno
| Passenger | Boeing 737 · Airbus A320 |
| Regional | ATR 42/72 · De Havilland Q400 · Embraer E175/E195 |
| Business jets | Cessna Citation · Pilatus PC-24 · Gulfstream G650 · Bombardier Global |
| Military transport | CASA C-295 · C-130 Hercules (NATO users) |
| Cargo | Boeing 737-SF · ATR-72 Cargo |
Per the city's plans. Today the airfield mainly handles training, private recreational and business flights; larger military aircraft use it only during exercises, without full load.
Aimed at strengthening the region's economic, educational and defence potential, supporting crisis response and relieving the regional network – the city notes Krosno could serve as a backup airfield for Rzeszów-Jasionka.
Operations rose from just under 15,000 in 2024 to almost 19,000 in 2025 and are forecast to exceed 20,000 in 2026, according to the airport operator.
The city envisions an investment zone beside the airfield to attract aviation-industry and aircraft-service companies that today prefer airports able to take larger aircraft. Passenger flights and regular cargo are named as future possibilities.
These are plans of the City of Krosno – they are not part of this sale and are not guaranteed. A building permit and funding are still required, and the environmental decision may be appealed within 14 days of receipt. Buyers should independently verify the programme's status and any planning or airspace constraints affecting the site. The site adjoins the airfield, but a physical airside (taxiway or apron) connection is not part of this sale and would need to be agreed with the airport operator and the City; buyers should verify this independently. Sources: Nowiny24 · City of Krosno (BIP), official announcement.
Aerial drone footage of the 2.99-hectare industrial site showing the full production complex, warehousing, and surrounding industrial zone.
The two production halls total 9,118 m² of usable area, supported by its own 20 kV transformer station (15 kV connection) and gas infrastructure on site.
Independent power supply for the entire site – a key enabler for energy-intensive industrial, logistics or data uses. 20 kV station; the grid connection is 15 kV.
Gas infrastructure on site; technical parameters to be obtained from the trustee.
Wells S-1 and S-2 and an internal water network owned by the owner of the plots. Town water: from a neighbour or via a separate metering point on the MPGK Krosno network. The possibility and terms of town-water supply (including a tie-in to a neighbouring property's network or a new connection to the MPGK Krosno network) are not represented or warranted by the Trustee; costs and formalities are borne by the buyer. Wastewater and stormwater discharge – under water-law permits (see below).
Nine buildings: two production halls (9,118 m²), office block, raw-materials store, further warehouses, workshop, guardhouse and transformer station.
Industrial site of ~2.99 ha (of which ~2.34 ha built-up) in Krosno's industrial zone with road access.
Substantial enclosed volume across the nine buildings – hall height up to 8 m (main hall), adaptable to assembly, logistics or storage uses.
The plant holds the following environmental permits:
Krosno lies in the Subcarpathian Voivodeship, on the south-eastern edge of the EU. The city is investing in its airfield – with a runway extension to 2 km planned – and has an established industrial zone with a skilled workforce and specialist suppliers.
The site sits within Krosno's established industrial zone, with direct road access and directly adjoining Krosno Airport (EPKR). Rzeszów-Jasionka Airport (~60 km) offers the region's main commercial air connections. Per the appraisal, the site is about 5 km from Krosno city centre and ~2.5 km from national road DK28.
Critically, Krosno is approximately 90km from the Ukrainian border – making this one of the closest EU-standard manufacturing facilities to Ukraine.
Labour costs in Subcarpathia are significantly lower than Western Europe while the site enjoys full EU Single Market access and established export relationships.
ul. Lotników 4a, Krosno – Industrial Zone, Subcarpathian Voivodeship

The site lies in the industrial belt between Krosno and Szczepańcowa, beside Krosno Airport – surrounded by established industry and logistics, and by a road network the city is actively upgrading.

Check the current status of the land and mortgage registers (EKW browser) ↗
Extract of the county's online map showing the utility networks on and around the plots – useful for checking connection points and network routes. In the portal, switch on the layer shown below.
Layer path (portal in Polish): Open the map ↗Larger map (JPG) ↗The sale is structured as an Organised Part of an Enterprise (ZCP). Here is exactly what transfers to the buyer.
Employees currently work for the lessee – not the bankrupt estate. A new owner negotiates directly with staff. No legacy liabilities are assumed by the buyer.
| Sale type | Tender for a ZCP (Organised Part of an Enterprise) |
| Conducted by | Bankruptcy Trustee (Syndyk), court-supervised |
| Price | from USD 2.55M (PLN 9.9M) – contact Trustee for current terms |
| VAT | Outside the scope of VAT – ZCP transfer is not subject to VAT |
| Liabilities assumed | None – this is an asset deal; the buyer does not assume the liabilities of the bankruptcy estate |
| Title | Art. 313 Bankruptcy Law: encumbrances in Division IV of the land and mortgage registers expire at the moment of sale and will be struck off |
| Existing lease | Rent agreement in place – 2-month termination notice |
| Planning status | Krosno plots: local plan zone 12PU (production & services). Szczepańcowa plots: land-use study zone UC (development areas incl. existing industrial plants); no binding local plan currently in force |

Site development plan showing all nine buildings (numbering matches the technical table below), plot boundaries, road access and the relationship to Krosno Airport (EPKR).
| # | Building | Footprint m² | Usable Area m² | Volume m³ |
|---|---|---|---|---|
| 1 | Production Hall #1 | 4,026 | 5,102 | 30,963 |
| 2 | Production Hall #2 | 3,219 | 4,016 | 23,620 |
| 3 | Office Building | 400 | 690 | 3,200 |
| 4 | Raw Materials Warehouse | 711 | 711 | 2,806 |
| 5 | Guardhouse | 25 | 12 | 80 |
| 6 | Transformer Station | 65 | 60 | – |
| 7 | Mechanical Workshop | 74 | 64 | 360 |
| 8 | Finished Goods Warehouse ★ | 1,847 | 1,800 | 8,230 |
| 9 | Additional Warehouse ★ | 1,621 | 1,476 | 7,273 |
| Total | 11,988 | 13,931 | 76,532 | |
★ Buildings #8 and #9 sit on separate cadastral plots. They are part of the sale package. Appraiser's technical data: built in stages 1993–2007 (steel-frame halls with insulated panels); technical wear 25–35% for the main buildings. The newest warehouse (#9) has no occupancy permit yet – completion works were estimated at USD 69,500 net (July 2022).
Note for Investors – Appraised Value: The independent real-property appraisal (25 Jan 2023) puts the market value of the land and buildings at USD 5.37M: USD 3.68M for the main production real estate (halls and buildings plus the perpetual usufruct), USD 1.65M for the warehouse plots (#8–#9, part of the package) and USD 39,000 for the remaining plots. Machinery is valued separately. The price of USD 2.55M (PLN 9.9M) is about 47% below the total appraised value of the land and buildings (about PLN 711 / USD 183 per m² of usable floor area) – and the buyer also gets ready energy infrastructure and existing lease revenue. Appraisal values exclude VAT.


Original architectural ground-floor drawings of the main production hall complex, showing column grid, room layout and structural details. Click a plan to enlarge. Drawings are historical archive copies and carry hand annotations; they should be verified against the current as-built condition.
From the electricity supply and distribution terms for the plant at ul. Lotników 4A (annex to the PGE agreement):
| Connection power | 1,000 kW (connection group III) |
| Contracted power | 300 kW under the current contract – about 700 kW of connection capacity above it |
| Supply point | 15 kV connection to the site’s own 20 kV transformer station (“Huta Szkła DECO-GLASS”, fields 3–6); the station and equipment are operated by the customer |
| Voltage / fuses | 0.4 kV nominal; pre-meter fuses 500 A |
| Tariff | B23 (distribution and energy sale), monthly billing |
| Provider | PGE Obrót S.A. |
Source: annex to the current electricity agreement (scan). Terms for a new owner must be agreed with the provider and the grid operator.
View the document (PDF) ↗The primary scenario is a Modular Multi-Tenant Industrial Complex, with rental revenue already in place. Further repositioning scenarios build on the site's infrastructure and, above all, on the planned expansion of the adjacent airport.
Divide the nine-building complex into independent production-warehouse modules for multiple lessees. An existing rent agreement (2-month termination notice) provides interim revenue while modules are prepared. Diversifying revenue across several tenants is the model banks readily finance as a stable commercial property portfolio – lower vacancy risk, higher net yield (NOI) – and adjacency to an expanding airfield makes the complex attractive to logistics- and aviation-linked tenants.
The city wants to attract aviation-industry and aircraft-service companies that today settle around airports able to take larger aircraft, and lists a training-and-research base for the aviation sector among the programme's goals. The halls beside the airfield could be adapted for maintenance, component workshops or training use.
With the runway planned at 2 km, the airfield is meant to handle freighter types such as the Boeing 737-SF and ATR-72 Cargo, and regular cargo is among the future possibilities the city names. Convert halls into a cargo terminal linking air and road transport, serving e-commerce and courier volumes in south-eastern Poland.
Proximity to Krosno Airport and large hall volumes suit the unmanned aerial vehicle sector: assembly lines, control rooms and test hangars beside the airfield. The airport programme is itself designed as dual-use (civil-military) infrastructure, and the UAV sector carries strong EU grant and defence co-financing potential.
In an era of grid connection deficits across Europe, this site is a ready-made skeleton for a data processing centre, AI rendering farm, or high-density compute facility. The own 20 kV transformer station (15 kV grid connection) provides a rare large-capacity connection. Gas infrastructure on site could enable CHP cogeneration for backup power and energy arbitrage (subject to confirmed gas parameters). Scale is set by the current 1 MW connection; larger loads would require a grid-capacity upgrade.
14,000 m² of south-facing rooftop area combined with a high-capacity grid connection makes this a natural platform for a commercial energy storage system paired with large-scale photovoltaics. The strong grid tie-in enables energy arbitrage or local grid stabilisation – eligible for significant CEF and EU climate fund support. Scale depends on the current 1 MW connection; larger storage or PV export would require a grid-capacity upgrade.
The current tenant has been in place for 9 years and pays PLN 95,000 per month plus VAT – PLN 1.14M (≈ USD 293,000) per annum net. A buyer steps into the landlord role with this cash flow from day one. The current annual rent corresponds to approx. 11.5% of the minimum price, before owner's costs and CAPEX.
The tenant leases buildings #1–#7. Warehouses #8 and #9 (~3,276 m²) are not let and are available for new tenants.
The ZCP is let under a lease agreement (currently PLN 1.14M p.a. net (≈ USD 293k)) for a fixed term until December 2026, with the possibility of concluding a new agreement. The agreement terminates upon the sale, subject to a 2-month notice period. Interim revenue from day one or a short horizon for repositioning/re-letting. The tenant has no right of first refusal.
Terminate: the lease terminates 2 months after the sale of the ZCP. The buyer may reposition or re-let the buildings. Continue: alternatively, the buyer steps into the trustee's shoes as landlord and keeps the tenant and the rent. The full lease, rent roll and payment history are available after signing an NDA.
An MRO, aircraft-services, UAV or aerospace-supplier business wanting space beside an airfield planned to take larger aircraft – with power and gas already on site.
An investor from Ukraine or CEE seeking EU-based manufacturing infrastructure, 90km from the Ukrainian border with EU market access.
A fund focused on distressed industrial assets – acquiring below appraised value, using the existing rent agreement for interim revenue, then repositioning around the airport expansion for a trade exit.
A commercial property investor or REIT seeking a multi-tenant industrial complex with revenue in place, its own 20 kV transformer station (15 kV connection), airport adjacency and a title free of encumbrances (Art. 313) – a rare institutional-grade asset below appraised value.
The court declares Milomax S.A. bankrupt
The trustee takes over management of the bankruptcy estate
Appraisals, inventory, documentation
Date of the next offer round to be announced by the trustee – register your interest now
Agreement in the form of a notarial deed; encumbrances expire (Art. 313)
The new owner takes over the property; Division IV encumbrances struck off
A detailed timeline with dates and court documents is available in the trustee's due diligence pack.
The organised part of the enterprise (ZCP) is offered by the trustee in bankruptcy proceedings conducted under the Bankruptcy Law, supervised by the supervisory judge and with the participation of creditors to the extent provided by law. The sale follows clearly defined legal rules, ensuring a high level of transparency and predictability.
When assets (including real estate) are sold, they are acquired, as a rule, free of encumbrances, which are transferred to the sale price in accordance with applicable law. Under Art. 313 of the Bankruptcy Law the sale has the effect of an enforcement sale: upon conclusion of the sale agreement, rights and personal claims disclosed in the land and mortgage register or reported to the trustee within the statutory deadline expire, and the entitled parties are satisfied from the sale price.
The transaction is an asset deal: the buyer does not assume the liabilities of the bankruptcy estate, and employees are employed by the lessee – no employment relationships pass to the buyer.
This transaction structure is widely used in professional dealings and is one of the most orderly and predictable forms of asset acquisition on the restructuring and insolvency market in Poland.
The documents come from the Trustee or were prepared on the basis of the Trustee’s materials. They allow you to assess the property before making an offer. The full list of documents (data room) is in the dropdown below.
Here you will find all the documents that let you assess the property before making an offer: land registers, valuations, the lease, technical condition, utilities and legal matters. The documents are organised in 10 sections (00–09). Some can be downloaded right away, some will be released by the Trustee after you sign a confidentiality agreement (NDA), and some are still being completed. Start with: 00.04 Information on sale terms and 01.01 Investment brochure. The number begins with the section (e.g. 03 = valuations, revenue and costs).
Available files can be downloaded or viewed. Confidential documents are released after signing an NDA (contact: [email protected]). Index as Excel: Download XLSX.
Summaries and information marked "Draft" or based on the brochure are for information only – the Tender Rules and the sale agreement are binding. Information on the airport expansion concerns the city's project, which is not part of the sale. In case of discrepancies between language versions, the Polish version prevails.
Announcement of the new tender for the sale of the organised part of the enterprise – date to be announced.
Current trustee tender rules – pricing, terms and bidding procedure.
Five-page summary: asset, location, infrastructure, lease economics and sale process.
12-page brochure: real estate, utilities & permits, location & airport, unencumbered sale, ZCP scope, lease and transaction process.
Official surveyor's appraisal (operat szacunkowy) of the land and all buildings.
Independent appraisal of the full Organised Enterprise Part including movables and goodwill.
Appraiser's opinion (Jan 2023) on condition and value of all assets.
Full inventory of all movable assets as at 30 September 2022.
Annex to the PGE electricity sales and distribution agreement: connection power, tariff and supply point.
Register your interest with the Bankruptcy Trustee, download the information pack, and arrange a site visit.
Due diligence materials are available immediately upon request.
The information presented on this page is for informational purposes only and does not constitute a commercial offer within the meaning of Art. 66 §1 of the Polish Civil Code, nor an investment recommendation. The Trustee and the authors of this page bear no responsibility for investment decisions made on the basis of materials contained herein. All investment decisions are made at the sole risk and discretion of the reader. Amounts originally stated in PLN are shown in US dollars for convenience, converted at the NBP average rate of 2 October 2026 (1 USD = 3.8881 PLN) and rounded; they are indicative only – the PLN amounts apply to the transaction.